News and events

Smart Manufacturing Summit 2017 , 24 April 2017, Par D. Vernay

Smart Manufacturing Summit 2017

Mu-TEST will be present during the Smart Manufacturing Summit in Orly (Fr) on 8 June 2017. Please met with us during the Event

Minalogic Business Meetings on 26/4/2017 , 24 April 2017, Par D. Vernay

Minalogic Business Meetings on 26/4/2017

Apr. 26, 2017, Grenoble: Mu-TEST will participate to the Minalogic Business Meetings

ISD , 24 May 2016, Par D. Vernay

ISD

Mu-TEST will participate to the ISD (Industry Space Days) Summit in Noordwijk (The Netherland) (20/22 Sep 2016)

CEA , 05 April 2016, Par D. Vernay

CEA

CEA has selected Mu-TEST equipment

Cables Connection: No compromise! , 05 April 2016, Par D. Vernay

Cables Connection: No compromise!

Mu-TEST just released a unique System-to-DUT cable (up to 6 meters) connection solution keeping system and instruments performances up to the DUT thanks to it fully integrated and automated calibration capability

LSW , 05 April 2016, Par D. Vernay

LSW

Mu-TEST will participate to the London Space Week in London (November 15th/16th 2016)

ASD London , 05 April 2016, Par D. Vernay

ASD London

Mu-TEST will participate to the ASD (AeroSpaceDefense Days) in London (3/4 May 2016)

Mu-TEST is ISO 9001 : 2008 Certified , 12 Feb 2015, Par D. Vernay

Mu-TEST is ISO 9001 : 2008 Certified

Mu-TEST is ISO 9001 : 2008 Certified

Mu-TEST 10S: The 3-in-1 system! , 19 Nov 2014, Par D. Vernay

Mu-TEST 10S: The 3-in-1 system!

Mu-TEST has just launched his M-10S: The first true 3-in-1 ATE system! The M-10S offers not only up to 10 slots fully integrated ATE system but also 2 independent M-5S systems, 5 slots each for true un-limited flexibility

M-WR48 Wide Range Instrument , 24 Sep 2014, Par D. Vernay

M-WR48 Wide Range Instrument

Mu-TEST up to 24V testing thanks to the M-WR48 instrument

Up to 1.6 Gbps datarate instrument! , 17 Sep 2014, Par D. Vernay

Up to 1.6 Gbps datarate instrument!

Mu-TEST test coverage up to 1.6 Gbps on all 32 pins thanks to the instrument M-D1632

DDR controller testing , 18 March 2014, Par D. Vernay

DDR controller testing

Automated testing of DDR controllers is a major technical challenge, requiring source synchronous mode capability, high speed digital acquisition, timing accuracy...Everything that Mu-TEST system has !

New ! FPGA testing , 19 Aug 2013, Par D. Vernay

New ! FPGA testing

Mu-TEST now releases a demo test program for FPGA testing. Running on Xilinx Virtex 4 vehicle test, it shows all the functionalities required (RAM blocks, DSPs...)

Thales Group selects Mu-TEST as new test platform , 25 Jun 2013, Par D. Vernay

Thales Group selects Mu-TEST as new test platform

Thales has selected Mu-TEST equipment for testing of selected memories & digital devices

Cisco is using Mu-TEST , 10 Dec 2012, Par D. Vernay

 Cisco is using Mu-TEST

Cisco is using Mu-TEST test platform in California !